Karlsruhe full-scale F&G PRB with eight gates

Budapest University of Technology and Economics, Department of Applied Biotechnology and Food Science, Environmental Microbiology and Biotechnology Group

Organisation/Data provider's nameBudapest University of Technology and Economics, Department of Applied Biotechnology and Food Science, Environmental Microbiology and Biotechnology Group
Name of contact
Dr. Molnár Mónika, Dr. Feigl Viktória
Telephone/fax
+36-1-4632347
Technology Hungarian nameKarlsruhe full-scale F&G PRB with eight gates
Technology name
Karlsruhe full-scale F&G PRB with eight gates
Country of origin
Germany
Stage of development
developed, proven by demonstration
Start of the development
2000
End of the development
2004
Name of the National Programme
RUBIN
Contaminant group|Contaminant typically treated
  • Volatile (nonhalogenated) organic compounds
Other contaminants
acenaphthene
Typical initial value
50 µg/l
Maximum initial value
600 µg/l
Typical final value
0.2 µg/l
Environmental element/phase the method may be applied to
Subsurface water
Technology type
combined
Basis of the technology
Physical- chemical
Technology description

F&G system: 250 m length, north-south cölöpwall with 8 gates, a 18 m hosszú cölöpök 1 méteres távolságban vannak a vízzáró réteggel. A kapuk 18 méter hosszú előgyártott acél csövekből állnak,amelynek belső átmérői 1,8 m. A passzív kapuk aktív szénnel töltöttek.

Description of the novelty of the technology

A talajvíz majdnem teljes (> 99%) tisztítása F&G rendszerrel.Az in situ falon egy kis részt áteresztő falként alkalmazzák. A legfontossabb előny, hogy a reagálóanyag egy kis részre korlátozódik és ezáltal adva van a lehetőség arra, hogy a reaktor töltet idővel kicserélődik.

Remediation technology type
  • subsurface permeable reactive soil zone
  • subsurface Permeable Reactive Barrier (PRB) (cascade)
Remediation technology from contaminant point of view
immobilisation
Remediation technology from execution point of view
in situ
Technological parameters
Water flux
Contaminant amount
Monitored environmental element
Subsurface water
Capital costs
40.000 - 200.000 Euro
Specific total costs
no estimation
Costs
2-high
Time requirement
5-very low
Space requirement
5-very low
Workload requirement
5-very low
Equipment, apparata requirement
4-low
Qualified labour
4-low
Environmental risk and workplace risks
5-very low
Ability to meet the target value
4-high
Environmental efficiency
5-very high
Cost efficiency
4-good
Generation of any byproduct to be treated
yes
Automation/remote control
yes
Feasibility
4-good
Availability
3-average
Well known
3-average
Strengths

Fenntartási díj alacsony, korlátlan terület használat,semmilyen károsanyag kibocsájtás a légkörbe, nincs közvetlen kapcsolat a szennyeződéssel,

Weaknesses

Beruházási költség magas,Ismertség kicsi, technológiai ismeret kevés.

Possibilities

Terjedőben van, távirányítással működhet

Site name
Karlsruhe Gasworks
Location of the application, country
Németország
Location of the application, town
Karlsruhe
Start date of the application
2001
Summary of the charasteristic parameters of application

Vízzáró réteg: agyag, 10 méter.

Publications

Burmeier H, Birke,V., Ebert, M., Finkel, M., Rosenau, D., Schad, H. (2007): Anwendung von durchströmten Reinigungswänden zur Sanierung von Altlasten. Universität Lüneburg, Suderburg. Rubin Projekt Handbuch.

References

Burmeier H, Birke,V., Ebert, M., Finkel, M., Rosenau, D., Schad, H. (2007): Anwendung von durchströmten Reinigungswänden zur Sanierung von Altlasten. Universität Lüneburg, Suderburg. Rubin Projekt Handbuch.

Datasheet id (original)
294
Creator
Meggyes Tamas
Status
Verified
Adatlap típusaSoil remediation technology
Létrehozás
Módosítás